RUS  ENG
Full version
JOURNALS // Vestnik Yuzhno-Ural'skogo Universiteta. Seriya Matematicheskoe Modelirovanie i Programmirovanie // Archive

Vestnik YuUrGU. Ser. Mat. Model. Progr., 2015 Volume 8, Issue 1, Pages 24–45 (Mi vyuru247)

This article is cited in 4 papers

Survey Articles

A model of “nonadditive” routing problem where the costs depend on the set of pending tasks

A. G. Chentsovab, Ya. V. Saliiab

a Krasovskii Institute of Mathematics and Mechanics, Ural Branch of the Russian Academy of Sciences, Yekaterinburg, Russian Federation
b Ural Federal University Named after the First President of Russia B. N. Yeltsin, Yekaterinburg, Russian Federation

Abstract: We consider a generalization of the bottleneck (minimax) routing problem. The problem is to successively visit a number of megalopolises, complicated by precedence of constraints imposed on the order of megalopolises visited and the fact that the cost functions (of movement between megalopolises and of interior tasks) may explicitly depend on the list of tasks that are not completed at the present time. The process of movement is considered to be a sequence of steps, which include the exterior movement to the respective megalopolis and the following completion of (essentially interior) jobs connected with the megalopolis. The quality of the whole process is represented by the maximum cost of steps it consists of; the problem is to minimize the mentioned criterion (which yields a minimax problem, usually referred to as a “bottleneck problem”). Optimal solutions, in the form of a route-track pair (a track, or trajectory, conforms to a specific instance of a tour over the megalopolises, which are numbered in accordance with the route; the latter is defined by the transposition of indices), are constructed through a “nonstandard” variant of the dynamic programming method, which allows to avoid the process of constructing of all the values of the Bellman function whenever precedence constraints are present.

Keywords: dynamic programming; route; precedence constraints; sequential ordering problem.

UDC: 519.6

MSC: 90C90, 90C39

Received: 22.09.2014

Language: English

DOI: 10.14529/mmp150102



Bibliographic databases:


© Steklov Math. Inst. of RAS, 2026