RUS  ENG
Full version
JOURNALS // Vestnik Sankt-Peterburgskogo Universiteta. Seriya 10. Prikladnaya Matematika. Informatika. Protsessy Upravleniya // Archive

Vestnik S.-Petersburg Univ. Ser. 10. Prikl. Mat. Inform. Prots. Upr., 2016 Issue 2, Pages 80–86 (Mi vspui292)

This article is cited in 1 paper

Control processes

The influence of available capacity distribution type and fines on the optimal plan of the available capacity of the hydroelectric power plant

M. A. Budylina, S. V. Sokolovb

a Reshetnev Siberian State Aerospace University, 31, Krasnoyarsky Rabochy pr., 660014, Krasnoyarsk, Russian Federation
b St. Petersburg State University, 7–9, Universitetskaya nab., St. Petersburg, 199034, Russian Federation

Abstract: The article deals with the optimal hydroelectric power available capacity planning considering the distribution of available capacity and the penalty for difference between actual and planned available capacity. It is assumed that the available capacity may be characterized by different types of symmetrical distributions, and the penalty can range from 0 to $\infty$ of the difference between actual available capacity and planned. The planned value of the available capacity is determined, which maximizes the financial results of the hydroelectric power plants on the wholesale electricity market. Suggestions were made for available capacity planning optimization. A software package for calculating the optimal plan of available capacity hydroelectric power is developed. Refs 8. Figs 2.

Keywords: wholesale electricity and capacity market, competitive capacity selection, model for determination the optimal plan, hydroelectric power plants.

UDC: 338.984

Received: October 14, 2015
Accepted: February 25, 2016

DOI: 10.21638/11701/spbu10.2016.208



Bibliographic databases:


© Steklov Math. Inst. of RAS, 2026