RUS  ENG
Full version
JOURNALS // Bulletin of National University of Architectur and Construction of Armenia // Archive

Bulletin of National University of Architectur and Construction of Armenia, 2017 Issue 3, Pages 38–40 (Mi nuaca46)

Constructing

Construction of external precast bearing walls with the frost insulation layer

T. D. Hakobyan

CJSC Gazprom Armenia

Abstract: A new method of building walls and structures with frost insulation layers in fixed reinforced concrete slabs as a part of precast bearing wall and as an external formwork panel is recommended hereby. A closed or ventilated air space can be left between the frost insulation layers and slabs. The 55cm width slabs have height of a building floor and widened shelves at the bottom for better stability. Replacing the external formwork panel with fixed slabs ensures necessary thermal resistance of the walls formwork preparation actions are reduced together with metal and shields’ joints expenditures.

Keywords: inserts, fixed boards, shelves, shields.

UDC: 626:627

Received: 13.06.2017
Accepted: 12.10.2017

Language: Armenian



© Steklov Math. Inst. of RAS, 2026