RUS  ENG
Full version
JOURNALS // Avtomatika i Telemekhanika // Archive

Avtomat. i Telemekh., 2008 Issue 1, Pages 171–179 (Mi at599)

This article is cited in 2 papers

Control Hardware

Optimal scheduling of continuous production with constrained schedule structure

Yu. M. Tsodikov

Institute of Control Sciences, Russian Academy of Sciences, Moscow

Abstract: The problem of optimal multi-period production scheduling for continuous-discrete production was formulated as that of mixed-integer programming with a special structure of the constraints on the discrete variables. As was shown, this form of taking into consideration the a priori requirements on the schedule enables reduction in the number of possible variants of values of the discrete variables and, thus, simplification of the problem. The results obtained were verified by way of a plant model.

PACS: 02.30.Yy, 02.10.Ox, 02.50.Le

Presented by the member of Editorial Board: A. I. Propoi

Received: 12.02.2007


 English version:
Automation and Remote Control, 2008, 69:1, 158–165

Bibliographic databases:


© Steklov Math. Inst. of RAS, 2026